Combs Miniature Railway - Photo Album

Boards made ready with folding legs. Click for Larger Image Pete doing the wiring for Board 3. Click for Larger Image Wiring for Board 4 in progress. Click for Larger Image The base of the original L shape with the station (Boards 1, 2 and 3). Click for a Larger Image
The leg of the original L shape showing the Fiddle Yard (Boards 4, 5 and 6). Click for a Larger Image The inside of the completed Control Desk. Click for a Larger Image Taken from the rear entrance to the garage where the flaps have been installed. Click for a Larger Image The final layout design, taken from the open garage door down the layout. Click for a Larger Image
General view from the station building down the platforms. Click for a Larger Image Brighton Belle now departing Platform 2 and the Canadian Pacific has arrived on Platofrm 3. Click for a Larger Image Brighton Belle passes the complex pointwork at the entrance to the Fiddle Yard, whilst the Track Cleaning Hymek in CMR livery waits clearance at the signal. Click for a Larger Image Pointwork at the station throat. Brighton Belle on his way. Click for a Larger Image
I'm the Fat Controller and I'm shunting the trucks. Click for a Larger Image But Grandad, I wanted to put the trucks in that Shed! Click for a Larger Image Oops, on my best behaviour now, Grandma on patrol. Click for a Larger Image